RFQ Preparation Checklist
- 2D/3D CAD with revision number and all critical tolerances
- Assembly interface, mating parts, and fit-up requirements
- Material grade, purity, coating, cleaning, and inspection requirements
- Application environment, operating temperature, atmosphere, and service cycle
- Prototype quantity, annual forecast, destination, and requested lead time



