RFQ Checklist
- Susceptor or carrier drawing with wafer pocket and interface dimensions
- Base graphite grade, coating material, and coating thickness target
- Equipment model, process gases, cleaning method, and temperature window
- Coated and uncoated surface map with inspection acceptance criteria
- Prototype quantity, annual forecast, destination, and requested timeline



